|
On June 4th Clarage opened its new plant in Pulaski, TN. The 58,000 square foot
facility is equipped with 150 tons of lifting, a 100,000 lb. balance machine, a vertical
shaft installation pit, overspeed and performance testing, state-of-the-art and
all new CNC manufacturing equipment. The plant will produce heavy duty fans, housings,
dampers and dust collectors for Power, API, Pulp and Paper, Tunnel Ventilation,
Metals and other markets.
|